Chambal – Bhilwara Water Supply project Phase -I
Chambal – Bhilwara Water Supply project is planned in 2 phases.
Phase I is a infra structure project. Transmission system from Chambal River Bhaisroadgarh is completed under Phase I of Project.
Chambal – Bhilwara Water Supply project Phase - II
Chambal – Bhilwara Water Supply project Phase II is envisaged to cover 8 towns and 1698 villages of Bhilwara District through 8 packages.
SHAYGARH WATER SUPPLY PROJECT DISTT BARAN
Shaygarh water supply project for coverage of 46 villages &16 OH of Baran District was sanctioned in 190th PPC for 69.76 Cr. Revised sanction was accorded in 197th PPC for Rs. 76.76 Cr. Further revised sanction was accorded in 19th SLSSC for Rs. 104.57 Cr. Work order for the project was awarded to M/S Dara Engineering & Infrastructure Ltd on 10.11.2017. Coverage of villages under the project was started from April'2020 and all the villages proposed under the project has been commissioned up to September'2020, in phase manner. Physically project has been completed on 10.11.2020 and since then regular water supply in the connected villages is being done through Public Stand Posts. Presently project is running under O&M by the project executing firm
GAGREEN WATER SUPPLY PROJECT DISTT JHALAWAR
Gagreen water supply project for coverage of 311 villages & 36 OH of Jhalawar District was sanctioned in 192th PPC for RS 351.48 Cr. Work order for the project was awarded to M/S SPML Infra Gurgaon on 22.08.2013. Coverage of villages under the project was started from June 2019 and all the villages proposed under the project has been commissioned up to May 2019, in phase manner. Physically project has been completed on 24.09.2021 and since then regular water supply in the connected villages is being done through Public Stand Posts. Presently project is running under O&M by the project executing firm
RAJGARH WATER SUPPLY PROJECT DISTT JHALAWAR
Rajgarh water supply project for coverage of 54 villages &15 OH of Jhalawar District was sanctioned in 196th PPC for 67.17 Cr and revised in FC 746 for 149.31 Cr on dated 13.07.2018 . Work order for the project was awarded to M/S Dara Construction Company Jodhpur on 12.05.2016. Coverage of villages under the project was started from April'2019 and all the villages proposed under the project has been commissioned up to November'2018, in phase manner. Physically project has been completed on 31.12.2018 and since then regular water supply in the connected villages is being done through Public Stand Posts. Presently project is running under O&M by the project executing firm
ATRU SHERGARH WATER SUPPLY PROJECT DISTT BARAN
Atru Shergarh water supply project for coverage of 03 towns, 26 villages &07 OH of Baran District was sanctioned in 197th PPC for 89.69 Cr. Work order for the project was awarded to M/S Vishnu Prakash R. Punglia Jodhpur on 24.03.2017. Coverage of villages under the project was started from April'2019 and all the villages proposed under the project has been commissioned up to October'2019, in phase manner. Physically project has been completed on 31.01.2020 and since then regular water supply in the connected villages is being done through Public Stand Posts. Presently project is running under O&M by the project executing firm
RWSS RGLC RD 159.150 Km Panchala-Ghewra-Cherai-Project, District Jodhpur
· A&F sanction in 190th PPC dated 30.05.13 for Rs Rs.396.63 Cr
· Source- Rajiv Gandhi Lift Canal
· MP Constituency: 5 villages of Jodhpur & 54 villages of Pali Distt.
· MLA Constituency: 54 village of Osian & 5 villages on Lohawat Distt.
· Work order issued by M/s IVRCL, Hyderabad dt. 4.10.13 for Total: Rs. 348.77 Cr. (Rs.320.27 Cr (Execution Part) & Rs.28.50 Cr (O&M Part)
· Stipulated date of commencement: dt. 14.10.2013
· Stipulated date of completion: dt. 14.10.2016
· Benefitted: 59 Main Habitations & 885 Other Habitations
· Project completed : Nov 2021 (Presently under O&M)
Bisalpur Tonk Uniyara Water Supply Project Package-1
The Bisalpur-Tonk-Uniyara Water Supply Project (BTU WSP) is envisaged to benefit 3 towns (Tonk,Deoli & Uniyara) & 464 rural villages of Tonk district in state of Rajasthan to provide safe & potable drinking water in the targeted areas. Phase-I of the Bisalpur Tonk Uniyara water supply project with Water Treatment Plant (WTP) designed to supply of 74 MLD along with all associated civil, EMI works at Rajmahal, Intermediate pumping stations along with 33/11 KV switchyards and associated civil, EMI works at different HW, CWR of different capacity along with associated works at different HW, Transmission pipelines between different pumping stations, testing, commissioning, trial run of whole the system and all related civil works on Single Point Responsibility basis Turnkey Job contract including necessary design, construction and Operation & Maintenance for Ten years
Nagaur Lift Project Phase-I
A&F Sanction of Nagaur Lift Project Phase-I was accorded by PPC on dated 07.08.2006 of Rs 761.01 Crore which is further revised to Rs 1194.03 Crore and sanctioned in 197th PPC dated 25.04.2016. In the Nagaur Lift Project, Phase-I total 5 Towns (Nagaur, Basni, Kuchera, Mundwa&Merta) and 494 Villages are targeted to be benefit with canal water. All 5 Tows and 494 village of Nagaur District are commissioned year 2021 and getting potable drinking water from Indira Gandhi Canal.
Pump House Daulatpura
Balance Work of Regional water supply schemes of 199 villages, along with their habitations, of P.S. Jawaja Tehsil Beawar District Ajmer under Fluoride control project on.
Jal Mitra
Additional Chief Engineer Support Activities (SA)
ESTI
Rajasthan Water Supply & Sewerage Management Board
Wash
QA & QC Manual
Annual Progress Report
Water Policy
Urban Town 2022-2023
2022-11-10-Final-Report-GWRA2022